528 Toll Brothers Project

Our Goal: Reducing the IMPACT of the Proposed 528 Boylston Street Luxury Apartments

4 REASONS WHY THIS WILL OVERWHELM THE COMMUNITY – CLICK HERE

In 2022, Toll Brothers proposed building a 244-unit, 7-story apartment complex at 528 Boylston St. (the Sam White Landscaping parcel), using Massachusetts General Laws Chapter 40B to override local single-family residential zoning regulations. This proposal gravely concerns abutters, neighbors, and hundreds of Newton residents. Feeling threatened by a large corporation, private citizens formed the 528 Boylston Committee to advocate for community interests, and over 1200 Newton residents have signed a petition in their support.
The community requests that Toll Brothers address the following issues in their proposal:

  1. Submit an independent traffic study, including all surrounding side streets.
  2. Reduce the building footprint, massing, and height to better fit the residential neighborhood.
  3. Mitigate traffic issues on Route 9, the Parker St. bridge, and the Hammond Pond Pkwy. underpass.
  4. Improve pedestrian safety and provide realistic public transportation options.
  5. Preserve most trees on this site and protect the surrounding wetlands.
  6. Mitigate light, noise, and pollution impacts during construction and long-term operation.
  7. Support future 528 Boylston residents with greater affordability and neighborhood integration.
 
528 Boylston St Final CONSERVATION COMMISSION DOCUMENTS

528 Boylston Civil Site Plans

528 Boylston Storage Exhibits

528 Boylston Drainage Report

528 Boylston Inv Species Mgt Plan

528 Boylston Landscape Plans

528 Boylston O&M Plan

528 Boylston Prelimin Construction Phasing

528 Boylston RFA Degredation

528 Boylston Test Pit Exhibit

4th 528 Boylston BSC Peer Review

 

528 Boylston St zONING BOARD OF APPEALS DOCUMENTS

   Comprehensive Permit Application 528 Boylston Street FILE DETAILS

                528 Boylston Street ZBA Permit Opinion Filed MAY 28 2024

                ZBA Meeting Packet from May 8, 2024 Packet

                 ZBA Meeting Packet from May 1, 2024 Packet #1

                                                                           & Packet #2

                ZBA Meeting Packet from April 10, 2024 (starts on page 45)

                 ZBA Meeting Packet from March 13, 2024 (entire document)

                 ZBA Meeting Packet from January 24, 2024 (entire document)

                ZBA Meeting Packet from November 1, 2023 (starts on page 25)

                 ZBA Meeting Packet from September 27, 2023 (entire document)

                  ZBA Meeting Packet from July 24 2023,(starts on page 115)

                 ZBA Meeting Packet from May 24 2023,(starts on page 29)

Comprehensive Permit Application 528 Boylston Street

 Zoom Meeting October 2022Toll Brothers Project at 528 Boylston Street

Request for Project Eligibility Letter 9/12/22
Project Eligibility Application 9/1/22
528 Boylston City Comments on Site Eligibility Compiled 10/12/22
Neighborhood letter to the ZBA 11/8/23
Project Eligibility Approval letter 2/1/23
Mass Housing Response to public records request
Urban Design Commission (UDC) 528 Boylston Street 11/12/22
Urban Design Commission (UDC) 528 Boylston Street 1/12/23 (Starts PAGE 17)
 
MEPA letter from Mass DOT March 2023